产品使用手册

Product Manual

Tips

Matters needing attention for date, week and month adjustment


Notes 1: In order to avoid the inaccurate alternation of calendar and month, it is not advised to adjust calendar and week during the period from 21:00 to 01:00 and adjust the month during the 26th-31st date range. If the adjustment is required to be made when the pointer indicates the above-mentioned timeslot, the operation can be undertaken according to the method indicated in "2.3 date and time adjustment". 

Notes 2: The alternation of week lasts for 4~5 hours, it is a normal phenomenon that the week display is not calibrated during the period from 24:00 to 4:00.